Consultant CM support on a design-build contract for ADA accessibility upgrades at two Bronx subway stations — 167th Street and Kingsbridge Road — with Forte Construction Corp as design-builder and Stantec as designer. The work required close coordination with the NYC Department of Transportation to maintain street functionality, and is a cost-effective model for accessibility improvements, on schedule for completion in the second quarter of next year.
Key contributions
- Prepared independent cost estimates for the additional replacement of 101 precast panels above the 23 identified in the project requirements.
- Negotiated equitable settlements with the contractor while ensuring compliance with agency standards.
- Authored contractual and technical correspondence supporting change-order submissions against commercial requirements.