← Back to index
DashboardTechnical Project2026

A multi-page Power BI report fully prepared by Opus 4.7. No measures or visual formatting by the user.

Type
Technical Project
Client
Sound Transit (modeled)
Role
Author
Year
2026
Power BITMDLPBIRDAXFabric CLITabular EditorDenebPower BI MCP

One model, any contract

Multi-page Power BI report for a Sound Transit roadway bridge program — a new vehicular concrete bridge and an adjacent earthwork package, modeled as two fully-independent contracts. Schema anchored to CSI MasterFormat 2020, CSI 01 33 00 submittal types, and PMIS workflow statuses so the same model hosts any contract type without schema changes.

Authored entirely by Opus 4.7 in PBIR/TMDL — version-controlled report-as-code.

Self-verifying build

Authored via Claude Code paired with the Fabric CLI and the Power BI Modeling MCP, with self-verification through Tabular Editor BPA, a DAX-UNION smoke harness, and UIAutomation-driven Desktop screenshots.

Power BITMDLPBIRDAXFabric CLITabular EditorDenebPower BI MCP
More projects